Skip to main content
Use this procedure when its prerequisites apply. Confirm each required aircraft state before acknowledging the corresponding checklist item.

General

Complete the preliminary, CDU, captain and first-officer procedures in the applicable ground configuration. Retain the side-specific requirements. A captain instrument or control does not satisfy an independent first-officer or standby check. Use the assigned detailed panel procedures for Set, Check, Test and Pass requirements. Observe the specified result and restore the required operating configuration after each actual cockpit test. Do not operate a system merely because its control appears in the reference list. Complete loading, performance preparation and the required equipment checks before progressing to the dependent departure procedures. Where an item requires an external inspection or crew adjustment, retain the assigned verification or explicit scenario exclusion.

1. Flight control panel — Check

Inspect the required flight-control panel configuration using an approved detailed subprocedure.
Expected response: CheckVerification: Require the specified switch/guard states and panel indications.

2. Navigation panel — Set

Resolve the source selectors and navigation-panel setup from the approved configuration.
Expected response: SetVerification: Observe each required selector state.

3. Display panel — Set

Apply the specified display-selection subprocedure and confirm the resulting display layout.
Expected response: SetVerification: Observe selector positions and the target displays.

4. Fuel panel — Set

Resolve the required pump/crossfeed configuration from the approved fuel-panel subprocedure and actual tank loading.
Expected response: SetVerification: Verify the specified pump positions and fuel distribution, with validated state decoding.

5. Electrical panel — Set

Use an approved electrical-panel subprocedure, confirming the intended source and bus configuration.
Expected response: SetVerification: Require the applicable switch, source and on-bus indications.

6. Overheat panel — Check

Perform the required overheat-panel inspection/test using its approved acceptance sequence.
Expected response: CheckVerification: Observe the correct test outcomes and final switch state.

7. Fire protection panel — Check

Check/test the fire-protection panel according to an approved normal preflight subprocedure; do not arm/discharge extinguishers merely because those commands exist.
Expected response: CheckVerification: Require each prescribed test indication and restored state.

8. APU as needed — Start

Decide whether APU use is required for the chosen ground-power/air plan. Start only under a supplied and validated APU subprocedure.
Expected response: StartVerification: Require APU running/available evidence and the requested electrical/air outcome.

9. Equipment cooling — Norm

Select the required NORM configuration for the applicable equipment-cooling switches.
Expected response: NORMVerification: Require switch-position evidence for both applicable controls.

Continue after this procedure

Continue to First officer preflight — part 2. The checklist adds no condition between these parts; the next part’s individual step conditions still apply.
Last modified on October 30, 2026