Skip to main content

Before Taxi

Enter this procedure after completion of the engine-start sequence and verification of the applicable engine-running condition. The start-lever IDLE check confirms the completed configuration; it does not replace the N2-gated fuel-admission steps in Engine Start. Complete generator, heat, air-system and start-switch selections. Verify ground equipment clear, the assigned takeoff flap configuration and the required flight-control check before taxi movement. Use the assigned taxi route and steering/braking procedure.
1

Generators 1 and 2 — ON

After completion of the engine-start procedure, select generators 1 and 2 ON. Verify the required generator and bus indications.
2

Probe heat — ON

Apply the checklist’s literal OFF or ON requirement to all applicable probe heat systems for the configured aircraft.
3

Wing anti-ice — As needed

For an explicit OFF, establish OFF. For As needed, first resolve the mission’s icing decision using an approved policy; do not infer it from temperature alone.
4

Engine anti-ice — As needed

Apply the required anti-ice state to the applicable engines; resolve As needed before issuing a command.
5

Pack switches — AUTO

Set both pack switches AUTO. Verify both selector positions using the applicable detent decoding.
6

Isolation valve — AUTO

Select the isolation-valve selector AUTO. Verify the selector position; verify actual valve state separately when required.
7

APU bleed — OFF

Select APU bleed OFF in accordance with the applicable air-supply configuration. Verify the required switch and valve indications.
8

APU switch — As needed

Resolve the required APU state for this phase from the mission’s electrical/air plan, then use a validated APU switch procedure.
9

Engine start switches — CONT

Select both engine start switches CONT. Verify both rotary-switch positions. These switches are separate from the fuel/start levers.
10

Engine start levers — IDLE

Set both engine start levers to IDLE. The start levers control fuel admission; they are separate from the rotary engine start switches.
11

Ground equipment clear — Verify

Obtain actual confirmation that the tug and relevant ground equipment are clear before taxi movement.
12

Flap lever — Set takeoff flaps

When the stated condition is satisfied, select the takeoff flap setting specified by the applicable performance data. Verify the required lever detent and actual flap/slat configuration.
13

Flight controls — Check

Perform the approved control movement/check sequence and confirm actual control-surface response.
14

Lower DU — BLANK

Set the lower display unit to BLANK and observe the result.

Detailed procedures

The following pages preserve each checklist item’s conditions, verification requirements and source identity.
Last modified on October 30, 2026