> ## Documentation Index
> Fetch the complete documentation index at: https://www.narev.ai/docs/llms.txt
> Use this file to discover all available pages before exploring further.

# MARUB Seven jet departure from runway 34R

> MARUB Seven jet departure from runway 34R.

## Before departure

MARUB Seven is an **RNP 1 departure for jets from runway 34R**. Keep indicated airspeed at or below **250 kt below 10,000 ft**. During the initial right turn, a tighter limit applies: **maximum 180 kt indicated airspeed and minimum 25° bank angle**.

During parallel runway operations, **do not turn left**. There are man-made obstacles and trees in the departure area.

## Initial climb to MARUB

1. Climb on track **335°**. The required climb gradient is **4.8% to 1,500 ft**, then **3.3%**.
2. At **500 ft**, turn **right** to intercept and follow track **075° to MARUB**. Observe the 180 kt maximum speed and 25° minimum bank angle during this turn.
3. At MARUB, follow the cleared transition below.

## Radar transition

At MARUB, continue on track **075°**. Expect radar vectors to the cleared route.

## Wollongong transition

At MARUB, turn **right** onto track **144°**. **At or above 10,000 ft**, turn **right**, direct to **WOL NDB**, then continue as cleared.

## Frequencies

All frequencies are MHz.

| Service | Frequency |
| - | - |
| ATIS | 118.55 |
| Airways clearance delivery | 133.8 |
| Surface movement east of runway 16R/34L | 121.7 |
| Surface movement west of runway 16R/34L | 126.5 |
| Tower | 124.7 |
| Departure north: north and east routes | 123.0 |
| Departure south: south, west and northwest routes | 129.7 |

## Sector altitudes and chart conventions

The **25 NM minimum sector altitude is 2,700 ft**, centred on the **YSSY aerodrome reference point**. The **10 NM minimum sector altitude is 2,100 ft**. Bearings are magnetic, with **13° east** variation. Altitudes are feet above mean sea level unless a flight level is stated. These route diagrams are **not to scale**.

Chart **SSYDP08-187**, revised **9 July 2026**, from the fixed publication cycle effective **3 September 2026**.

Source: © Airservices Australia, [Departure and Approach Procedures](https://www.airservicesaustralia.com/aip/current/dap/), SSYDP08-187.


This documentation is built and hosted on [Mintlify](https://mintlify.com), a developer documentation platform.